Sports, Athletics and Aquatic Facilities (SAAF)
November 26, 2017
Bid Pack 3A – Central Utility Plant I & 2 Including Ancillary Buildings
November 27, 2017

Bid Pack 1 Earth Work

  • Construction progress100%

Contractors

Gulf Dredging & General Contracting Co. KSC (Closed)

Visit website

Consultants

Canadian Consortium Architects in association with SSH International Engineering Consultants w.l.l.

Visit website

Bid Pack 1 Earth Work project contains the following:

Excavation and backfilling
Project Hoarding
Transplantation of the existing Palm trees
Demolition of existing utilities, buildings, roads, services etc

1) Location:

The whole site of Kuwait University main campus located in the East side of the University Avenue.

2) General:

- Excavation and Backfilling: Bid Package 1 works include cleaning, stripping, excavation and backfilling to provide a required level to construction. Suitable excavated soil will be stockpiled for others use. The objective of this package is to prepare the site for timely commencement of other packages.

- Hoarding: 8m high project hoarding will be installed along approx. 4.80 Km length around the perimeter of the campus. The Hoarding show digital images of the various projects within the main campus: Colleges, Sports and recreational facilities, Admin and Academic facilities, and Infrastructure and landscape development.

- Transplantation of the existing Palm trees: To facilitate construction, the existing palm trees on the Main campus will be relocated in the Nursery Area (South of the City).


"One of the largest educational campuses in the world."