Bid Pack 3B – Central Utility Plant CUP 3
November 27, 2017
Bid Pack 4B – Civil Works for Utility Service Tunnel (East)
November 28, 2017

Bid Pack 4A - Civil Works for Utility Service Tunnel (West) & Gravity Lines

  • Construction progress100%

Contractors

First Kuwaiti Trading & Contracting Co. W.L.L

Visit website

Consultants

Canadian Consortium Architects in association with SSH International Engineering Consultants w.l.l.

Visit website

Design & Form:

Bid Pack 4A - Civil Works for Utility Service Tunnel (West) & Gravity Lines contains the following building and services:

Bid Pack 4A – contains the Civil Works for Utility Service Tunnel (West) & the Gravity Lines

1) Location:

The site of Kuwait University main campus located in the East side of the University Avenue.

2) General:

Bid Pack 4A consists of underground main and branch tunnels civil works with an approximate length of 4.5 km for the main tunnel and 3.5 km for the branch tunnels with an average depth of 10 m approximately. The branch tunnels links the main tunnel to shelters, to colleges and to CUPs’ buildings. These tunnels will accommodate electromechanical utilities works which are part of BP3A package.

Bid Pack 4A includes also the construction of two gravity lines (sanitary and storm water pipelines) beneath the Oasis to connect the campus with the external MPW main lines.


"One of the largest educational campuses in the world."

English